行程概述
在 20 世纪 70 年代和 80 年代,伊泰普水电站还在建设中,人们认为这是法老的杰作,是当时统治巴西的狂妄自大的指挥官们的杰作。如今,三十年过去了,人们的看法已经大不相同。这座由巴西和巴拉圭的工人、技术操作员和工程师建造的跨国企业负责生产巴拉圭 95% 的电力,占巴西总电力消耗的 24%,日复一日地证明了它在国内和国际舞台上的影响力。第一台发电机组于 1984 年开始运行,从那时起,发电厂就不断打破生产和收入记录。除了生产能源外,伊泰普还是环境保护的象征。该公司经营着贝拉维斯塔生物港、持续的重新造林计划和促进鱼类生产和野生动物繁殖的项目。这里还有一座生态博物馆,讲述了这座无与伦比的工程的建设和维护故事。全景游览:观看发电厂纪录片。从中央观景台观看大坝和泄洪道(无需进入设施)
During the 1970´s and the 1980´s, while it was under construction, the Itaipu Hydroelectric Dam was regarded as a pharaonic work, fruit of the megalomaniac commanders ruling Brazil in those years. Today, after three decades, the perspective is quite different.
Responsible for the production of 95% of the electricity consumed in Paraguay, and for 24% of the whole Brazilian consumption, this binational enterprise –built by workers, technical operators and engineers from Brazil and Paraguay – proves day after day its magnitude in the national and the international scene.
The first generator unit started to operate in 1984, and since then the power plant has successively broken production and revenue records. Besides the production of energy, Itaipu also stands as a symbol of environment preservation. The company runs the Biological Haven Bela Vista, continuous reforestation programs and projects that foster fish production as well as wild animal reproduction. There is also an Eco-museum that tells the story of the construction and maintenance of this unrivaled work.
The Panoramic tour: Watch a documentary film on the power plant. See the dam and spillway from the central observation deck (without entering the facility)